The construction of the sewer system will improve public infrastructure and the quality of the living environment in the settlements of Dolenje and Gorenje Ponikve.
A total of 2,668 meters of sewer lines will be constructed, including 1,248 meters of pressure lines and two pumping stations. A total of 231 properties will be connected.
For stormwater runoff, 1,210 m of concrete pipes will be installed, and an 800 m-long power line will be constructed to supply the pumping stations and public lighting. This will ensure an energy-efficient wastewater collection and treatment system. Energy consumption, wastewater drainage and treatment costs, and CO2 emissions will be reduced.