The goal of the investment was the construction of a spillway with a retention space of 1,100 m3 and modification of the VT to increase the level of protection against floods with a total length of 27.6 m.
The measure will protect approximately 500 inhabitants and property worth around EUR 4 million.
Top 100 recipients:
Lesy České republiky, s.p.
- Reference
- 2.6.I1 in the CZ Recovery and Resilience Plan
- Project locations
- Czechia
- EU contribution
- €80 000
- Project website
- https://lesycr.cz/wp-content/...