Small watercourses and reservoirs - Hedging of Baštice

  • Project

The goal pf the investment was the reconstruction of the existing watercourse bed, including the buildings on it with a length of 305.5 m and a flood dam with a length of 285.3 m.

The implementation of the event will increase the level of protection against floods from the current Q5 to the proposed Q100 with a safety elevation of 0.3 m.