The goal pf the investment was the reconstruction of the existing watercourse bed, including the buildings on it with a length of 305.5 m and a flood dam with a length of 285.3 m.
The implementation of the event will increase the level of protection against floods from the current Q5 to the proposed Q100 with a safety elevation of 0.3 m.
Top 100 recipients:
Povodí Odry, s.p.
- Reference
- 2.6.I1 in the CZ Recovery and Resilience Plan
- Project locations
- Czechia
- EU contribution
- €531 000
- Project website
- https://www.pod.cz/data/...