
Copyright: Ricardo Zambujo
The intervention aims to improve traffic conditions and safety on the IP8 between Ferreira do Alentejo, after the roundabout with Estrada Regional 2 and Beja, before the roundabout with the IP2, in a 22.5km stretch.
Additional links:
- Reference
- C07-i02
- Project locations
- Portugal
- Project website
- https://www.infraestruturasdeportugal.pt...