The objective of the investment is to address bottlenecks in Croatia’s rail network, which is expected to increase the speed of operation, enhance railway safety and improve railway networks.
The measure consists of the construction, reconstruction and renovation of bridges, viaducts, culverts and cuttings on Croatia’s railway network.
This shall overcome the bottlenecks constituted by facilities between 50 and 77 years old.
Most of the lines concerned with this investment are part of the TEN-T comprehensive network.
Top 100 recipients
- HŽ INFRASTRUKTURA d.o.o. za upravljanje, održavanje i izgradnju željezničke infrastrukture
Additional media:
- Reference
- C1.4 R2-I3
- Project locations
- Croatia
- Project website
- https://fondovieu.gov.hr/...