
Copyright: Czech Railway Administration
The main objective of the construction is the establishment of new, fully barrier-free accessible platforms with a height of the boarding 550 mm above the track.
The existing culvert will replace underpass. In the station forecourt area will be built a public transport terminal.
Top 100 recipients:
- Správa železnic
- Reference
- 2.1.I3 in the CZ Recovery and Resilience Plan
- Project locations
- Czechia
- Project website
- https://mapy.spravazeleznic.cz/letaky...