Copyright: Railway Administration, state organisation
The main objective of the construction was to create new, fully barrier-free accessible platforms with a platform edge height of 550 mm above the track. The existing culvert was replaced by an underpass.
A public transport terminal will be built in the area in front of the station.
Additional links:
- https://www.spravazeleznic.cz/web/guest
- https://mapy.spravazeleznic.cz/letaky/S631700078_202406201106.pdf
Top 100 recipients:
- Správa železnic, státní organizace
- Reference
- 2.1.I3
- Project locations
- Czechia
- Project website
- https://mapy.spravazeleznic.cz/...