Skip to main content
European Commission logo
Reforms and Investments

Rače Fram Municipality - Construction of the Pečovnik Water Reservoir

  • Project

The purpose of the project is to ensure an efficient and hydraulically improved drinking water supply system, with an emphasis on water use and reducing energy consumption within the system. A total of 183 residents will be newly connected to the public supply of health-compliant drinking water.

The project’s objective is to improve hydraulic conditions in the network, thereby reducing average energy consumption and ensuring uniform control over water distributed to the network.

Additional media

SI_LOC_319_images.jpg
© Rače Fram Municipality