The greatest challenges during the renovation were the repair of damage to the lintels, parapets, and vaults.
As part of the comprehensive restoration, both the street and courtyard façades were returned to their 18th-century appearance, reflecting the period in which the palace was originally built. The interior, by contrast, was restored to reflect its second dominant phase from the 1940s.
- Reference
- C7.2 I2
- Project locations
- Croatia
- Project website
- https://mpgi.gov.hr/vijesti-8/premije...
