
Copyright: Romanian Goverment
The main objective of the project is the creation of a new electricity production capacity from renewable sources (solar energy), with an integrated storage facility with a total installed power of 1 MW, which will be used both for own consumption (min. 50% of the production annual of the plant) as well as for sale in order to obtain profit and support a low carbon economy.
Additional Links:
https://obiectiv-online.ro/...
Additional Images:
- Reference
- C6-I1/C16-I2
- Project locations
- Romania
- Project website
- https://ecoaqua.ro/...


