Modernization of the sludge management system at the Central Wastewater Treatment Plant in Toruń, including the delivery and installation of a new power generator along with the modernization of the SO-2 station, the 11R switchgear, and the construction of a new transformer station; expansion of desulfurization units; replacement of siloxane removal installations; expansion of the biogas drying station; modernization of the blower; and modernization of grit chambers along with the replacement of pumps in the recirculated and excess sludge pumping station.
- Reference
- B3.4.1
- Project locations
- Poland