Infrastructure renewal and measures for increasing the energy efficiency, renovation and supply of equipment and furniture of the building of "Hristo Botev" Secondary Sch

  • Project

The building subject of the project is located in the town of Oryahovo, 23 "Kosta Lulchev" street. It was built in 1930 as a school and is still used for its intended purpose. 

The building has 3 floors with monolithic construction, consists of two buildings. The roof is pitched, with a wooden structure, without thermal insulation. Heating is provided by a local coal-fired steam plant. Access to the building is through two entrances.

The project, financed with EUR 2.3 million from he Recovery and Resilience Facility, envisages carrying out a package of measures to achieve energy efficiency in the building of SU "Hristo Botev", Oryahovo: 

  • thermal insulation of walls, roof and floor;
  • replacement of windows and doors;
  • installation of an air-to-air heat pump system;
  • replacement of all lighting fixtures with LED;
  • installation of a photovoltaic system;
  • improving the access of persons with disabilities to and inside the relevant building. 

More than 307 students, a large part of them from minority groups, are educated daily at SU "Hristo Botev".