Skip to main content
European Commission logo
Reforms and Investments

Infrastructure renewal and measures for increasing energy efficiency, renovation and supply of equipment and furniture of the building of the Primary School "Nikola Yonko

  • Project

"Nikola Yonkov Vaptsarov" primary school in the village of Selanovtsi is a school in which more than 150 students are educated every day, a large part of them from minority groups and children with special educational needs. The training takes place in a single-shift mode. 

The project, financed with EUR 1,28 million from the Recovery and Resilience Facility, envisages the implementation of a package of measures to achieve energy efficiency in the building of the "Nikola Vaptsarov" elementary school in the village of Selanovtsi, as follows: thermal insulation of external walls, replacement of windows and doors, thermal insulation of the floor and installation of a highly efficient heat pump system "air-air" type. 

Replacement of lighting fixtures with LEDs and installation of exterior facade lighting. Installation of a photovoltaic system. The school has an accessible environment.

Additional links: