The project involves a comprehensive revitalization of the public space represented by the outdoor swimming pool in Świdnica, including: a complete reconstruction of the pool, installation of water supply, sanitary and stormwater drainage systems, electrical installations, lighting, and photovoltaic systems. A new technological building necessary for the facility’s operation was constructed, housing a modern, technologically advanced filtration station with a pool water purification system. Additionally, the surrounding area was landscaped and new greenery planted.
- Reference
- B3.4.1
- Project locations
- Poland