The primary objective of the project is to construct a sewer system with a wastewater treatment plant, which will improve living conditions for residents.
Eight new sewer lines with a total length of 1,031.6 meters will be constructed. This will enable the connection of 225 service connections for 58 residents who currently lack a proper wastewater collection and treatment system. The system will achieve energy neutrality. The project will result in savings in final and primary energy consumption and a reduction in CO2 emissions.