The subject of the action was the construction of a cycle path connecting the villages Ještětice - Bílý Újezd - Podbřezí.
The cycle path reflects the requirements for extension, continuity and interconnection of cycle paths and cycle routes of supra-regional and local importance.
The main objective is to connect and cover the Podbřezí municipality by a system of safe and attractive routes, passable in all weather conditions, which will provide cyclists with passage through the area with minimal contact with motorised traffic on the I/14 road.
One of the main principles for ensuring the safety of the cycle route is, above all, its separation from busy car traffic.
The cycle path is designed in a basic road width of 2.50 m with a bituminous cover, only on some sections it is between 3 and 3.25 m wide.
The length of the cycle path is 3 415 m.
- Reference
- 2.1.I4 in the CZ Recovery and Resilience Plan
- Project locations
- Czechia
- EU contribution
- €825 000
- Project website
- https://www.sfdi.cz/...