The project involved the reconstruction of Andersen, Północna, and Wapienna streets, including the construction of a retention reservoir on the Warszewiec stream, renovation of the Warszewiec stream along section 0+055 to 1+435, and the construction of stormwater drainage and a retention reservoir with access roads in the area of Kredowa, Urlopowa, and Ostoi–Zagórskiego streets in Szczecin.
- Reference
- B3.4.1
- Project locations
- Poland