The project involves the construction of a new headquarters in Radom as a backup dispatch center, including the supply and commissioning of network and telecommunication equipment, and installation of large-format displays for operator rooms at the facility located at ul. Stanikowskiego 8, Radom. The project aims to create decision-support systems for the Transmission System Operator (OSP) and ensure continuous availability of computer-based decision-support systems, which is critical for maintaining the security of electricity supply. These systems will enable monitoring and control of the network and connected devices, ensuring accuracy and timeliness of operational commands, increasingly needed for complex optimization tasks, and are essential for safe grid operation. Critical components of the system at the Radom site will operate from specially secured operator rooms and control centers. The project aligns with KPOD.12.07 G1.2.3 goals: development of transmission networks and smart energy infrastructure, supporting post-pandemic economic recovery, digital transformation, green energy, and energy efficiency. Its implementation will enhance the reliability and efficiency of transmission networks, contributing to national energy security.
- Reference
- G1.2.3
- Project locations
- Poland