As part of the project, a new elevator was installed in the school, accessible from both the exterior and the interior. The work also included modifying the entrances to classrooms by removing thresholds and constructing a new access path with a sidewalk leading to the elevator annex. The goal of the project was to improve conditions for students with disabilities and increase accessibility to the school environment.
Links and media
- Reference
- SK-C[C6]-I[I1]
- Project locations
- Slovakia
- Project website
- https://www.tsk.sk/aktualne-spravy/tl...
